10 kW Solar PV installation using 40 Solarworld Mono All Black panels and a Samil Solar River inverter, installed onto Mansfield Bowling Club. For more information on Commercial Solar PV systems onto Sports Clubs visit CTS Renewables at www.ctsrenewables.co.uk or come visit us in Mansfield, Nottinghamshire.
Showing posts with label install. Show all posts
Showing posts with label install. Show all posts
Thursday, 19 June 2014
Wednesday, 25 September 2013
6 kWp Panasonic Aquarea HC/MDF Air Source Heat Pump Installation, installed in Kirkthorpe, Wakefield.
6 kWp Panasonic Aquarea HC/MDF Air Source Heat Pump Installation, installed in Kirkthorpe, Wakefield. For more information visit CTS Renewables at http://www.ctsrenewables.co.uk/ or come visit us in Mansfield, Nottinghamshire.
Thursday, 29 August 2013
9 kWp and 16 kWp Air Source Heat Pump Installation using a Samsung Mono system, installed in Mansfield, Nottingham.
9 kWp RC090MHXEA and 16 kWp RC016MHXEA Air Source Heat Pump Installation using a Samsung Mono Signal Phase system with a 100l Gledhill buffer tank and 300l Gledhill cylinder, installed in Mansfield, Nottingham. For more information visit CTS Renewables at http://www.ctsrenewables.co.uk/ or come visit us in Mansfield, Nottinghamshire.
Thursday, 18 July 2013
24 kWp Boimass installation using 24kw MCZ Compact 24 (Red 365). System installed in Louth, Lincolnshire.
24 kWp Boimass installation using 24kw MCZ Compact 24 (Red 365). System installed in Louth, Lincolnshire. For more information visit CTS Renewables at http://www.ctsrenewables.co.uk/ or come visit us in Mansfield, Nottinghamshire.
Tuesday, 2 July 2013
Solar Thermal installation using a Kingspan 2108 Flat Plate Collector, installed in Batley, West Yorkshire.
Solar Thermal installation using a Kingspan 2108 Flat Plate Collector. System installed in Batley, West Yorkshire. For more information visit CTS Renewables at http://www.ctsrenewables.co.uk/ or come visit us in Mansfield, Nottinghamshire.
Wednesday, 6 March 2013
36kW Biomass Pellet Boiler Installation using a Grant Spira 36
36 kW Biomass Pellet Boiler Installation using a Grant Spira 36. This system was fitted to heat offices within Mansfield Town Football Club. The Grant unit is a condensing wood fuel pellet boiler with integrated pellet store, additionally a purpose built 2 tonne external fuel store was constructed to provide long term storage use. For more information on bio mass heating solutions or other renewable energy technologies please visit our website at http://www.ctsrenewables.co.uk/ or come visit us in Mansfield Woodhouse, Nottinghamshire.
Thursday, 10 January 2013
16 kWp Air Source Heat Pump, installed in Kent.
16 kWp Air Source Heat Pump Installation using a Samsung RC160MHXEA Mono system with a 210l Gledhill cylinder. Installed in Meopham, Kent. For more information visit CTS Renewables at http://www.ctsrenewables.co.uk/ or come visit us in Mansfield, Nottinghamshire.
Subscribe to:
Posts (Atom)